To amend the Federal Power Act with respect to the criteria and process to qualify as a qualifying conduit hydropower facility.

HB 2786 To amend the Federal Power Act with respect to the criteria and process to qualify as a qualifying conduit hydropower facility

US Congress 115th Congress

To amend the Federal Power Act with respect to the criteria and process to qualify as a qualifying conduit hydropower facility.
HB-2786


About HB-2786
HB-2786 sections

To amend the Federal Power Act with respect to the criteria and process to qualify as a qualifying conduit hydropower facility.


Back to top

Section 1

This bill amends the Federal Power Act to revise the criteria for a facility to qualify as a qualifying conduit hydropower facility. Under current law, a hydropower facility must have a capacity that does not exceed five megawatts. This bill eliminates such requirement. Additionally, the bill revises the time frame from 45 days to 30 days for an entity to contest whether its hydroelectric facility meets the qualifying criteria.

  

Bill Texts

Introduced 07/12/2018

Introduced 07/13/2017

Engrossed 07/20/2017

Introduced 06/13/2017